Bridging grassroots technical mastery with large-scale corporate execution. We deliver resilient infrastructure—navigating the nation’s most challenging conditions with purpose.
Yogiraj Powertech Limited (YPL) is a pivotal partner in India’s national infrastructure narrative. Founded in 1989 by Mr. Ravindra Ganesh Nene, the firm began as a specialized proprietorship focusing on complex industrial pumping installations.
By 2010, the organization underwent a strategic pivot, incorporating as a Limited entity to bridge the gap between grassroots engineering conceptualization and large-scale corporate ground execution.
ISO 9001:2015 certified systems with IPO-ready internal controls.
Built on decades of mechanical grit and on-site problem solving.
Established as a specialized mechanical proprietorship.
Formal incorporation to scale national infrastructure works.
First 220kV substation work and major RDSS strengthening.
Achieving ₹100 Cr+ revenue trajectory and IPO readiness.
Five core verticals engineered for massive scale, from ultra-high voltage transmission to automated urban water networks.
HT/LT systems up to 220kV, ready to scale to 400kV projects.
Lift irrigation & supply systems with 600 HP pumping mastery.
Modernization under RDSS & IPDS schemes for national utilities.
Underground cabling and SCADA automation for future-ready cities.
Predictable, long-term performance optimization for critical assets.
We operate in high-barrier segments where pre-qualification rigor and safety protocols are non-negotiable.
Steered by a multi-generational team bridging traditional engineering discipline with digital modernization.
Founder, Strategic Vision
Director, Digital Scaling
Central Govt Projects
State Infrastructure
Over 800 successes delivered through a rigorous 9-phase quality control flow.
Feasibility and risk evaluation through platforms like CPPP and GeM.
Formalizing agreements with Bank Guarantees and Insurance.
In-house vetting: cable sizing, design development, and BOQ reconciliation.
Centralized vendor management with stringent Factory Acceptance Testing.
On-ground site mobilization, civil foundations, and mechanical-electrical works.
Joint testing with clients, pre-commissioning checks, and final energization.
Progress-based RA billing and financial reconciliation.
Defect Liability Period (DLP) responsibility and long-term AMCs.
ISO 9001:2015 monitoring and statutory audits for PF, GST, and labor.
Our growth is underpinned by conservative fiscal management and revenue diversification. With a transition from ₹1 Cr (1996) to a ₹100 Cr (Today) trajectory, we maintain zero long-term debt and high liquidity for rapid project mobilization.
| Year | Achievement |
|---|---|
| 2010 | Formal Incorporation |
| 2017 | ₹50 Cr Order Milestone |
| 2022 | ₹75 Cr Revenue Milestone |
| Today | ₹100 Cr+ Trajectory |
63% Electrical
14% O&M Annuity
0 Long-term Debt
800+ Successes
Positioning YPL for the next decade of Indian infrastructure growth, leveraging established credentials for trillion-dollar opportunities.
Electrical Infrastructure
Strategic positioning for the ₹76,000 Cr gateway project.
Smart Electrification
NAINA & Navi Mumbai Airport Influence Area development.
Charging Ecosystems
Scaling public charging networks and Solar BoS solutions.
Digital Water Management
AMRUT 2.0 integration for real-time municipal networks.