Legacy of Execution

Our Projects

Magnitude of execution, precision of engineering, and a proven record of national impact across 800+ successfully delivered projects.

Magnitude

From Grassroots to Institutional Scale

For YPL, "capability" is more than a technical claim; it is a measure of institutional trust. Our extensive track record serves as significant pre-qualification leverage for high-entry-barrier government tenders.

800+
Successfully Executed Projects

Substantiated record of delivery that defines us as a sophisticated execution partner across multi-state utilities.

ISO 9001:2015 EPC Leader

Formalized governance and statutory compliance (PF, GST, Labor Welfare).

₹100 Crore Trajectory

Fiscal discipline recognized by consecutive Certificates of Appreciation from the Ministry of Finance.

150+ Specialized Professionals

Turnkey accountability bridging grassroots grit with multi-generational management.

Project Portfolio Verticals

Strategically engineered to mitigate sectoral risk across the entire EPC value chain.

Power & Grid Modernization

Construction and augmentation of distribution networks. First 220 kV substation executed in 2022 alongside 65 MVA-class transformer installations.

Milestone: 220 kV Substation (2022)

Water Resources & Irrigation

Large-scale lift irrigation and pumping stations. Milestone installation of high-capacity pumps exceeding 600 HP (2024) with complex manifolds.

Milestone: 600 HP Pumping (2024)

Special & Strategic Establishments

Specialized infrastructure for BARC and JNPA. Higher echelon of safety compliance and reliability in restricted-access mission-critical zones.

Client Focus: BARC / JNPA

Mastery of Challenging Terrains

Operational success in high-stakes zones is the ultimate proof of an EPC contractor’s technical grit.

Case Study 01

Coastal Zones & Port Infrastructure

Mitigating saline-induced corrosion for the Jawaharlal Nehru Port Authority (JNPA). Delivered HT/LT cabling and substation upgrades in high-impact coastal weather.

Uninterrupted Trade Hub Delivery
Case Study 02

High-Security Zones (BARC)

Execution within Bhabha Atomic Research Centre demands adherence to the country’s most stringent QAP and security protocols. Navigating restricted-access corridors with discipline.

Zero-Tolerance Quality Standards
Case Study 03

Logistical Grit: Urban & Remote

Execution of pipe-pushing for HT cabling under active railway crossings in urban corridors. Vital water access to drought-prone MKVDC remote interiors via lift irrigation.

Precision Trenchless Maneuvers

National Mission Alignment

Aligning project delivery with flagship national programs to catalyst regional resilience and urban modernization.

Government Stewardship Partner
National SchemeYPL’s Technical Contribution
IPDS (Power Development)Substation augmentation, network strengthening, and HT/LT line upgrades to reduce AT&C losses.
Cyclone Risk MitigationDevelopment of resilient underground cabling and power infrastructure in high-risk coastal zones.
AMRUT / Smart CitiesUrban water network electrification, SCADA-enabled automation, and smart grid upgrades.
Jal Jeevan MissionExecution of turnkey pumping stations and rural water distribution systems in remote interiors.

The Execution Engine

Over 800 successes delivered through a rigorous 9-phase quality control flow.

01.

Tender & Bidding

Feasibility and risk evaluation through platforms like CPPP and GeM.

02.

Award & Mobilization

Formalizing agreements with Bank Guarantees and Insurance.

03.

Detailed Engineering

In-house vetting: cable sizing, design development, and BOQ reconciliation.

04.

Procurement (FAT)

Centralized vendor management with stringent Factory Acceptance Testing.

05.

Project Execution

On-ground site mobilization, civil foundations, and mechanical-electrical works.

06.

Commissioning

Joint testing with clients, pre-commissioning checks, and final energization.

07.

Financial Closure

Progress-based RA billing and financial reconciliation.

08.

Post-Completion

Defect Liability Period (DLP) responsibility and long-term AMCs.

09.

Compliance Audit

ISO 9001:2015 monitoring and statutory audits for PF, GST, and labor.

400 kV Readiness

Strategically positioning our EHV readiness for India's upcoming megaprojects: the ₹76,000+ Cr Vadhavan Port and "Third Mumbai" (NAINA) expansion.

Explore Our Work

Browse our extensive portfolio of projects across power, water, and urban infrastructure.

View Project Gallery