A Legacy of Excellence

Engineering Ethics &
Ethical Growth

35 years of de-risking national infrastructure through operational discipline, technical mastery, and institutional stability.

Section 01

The Genesis: Grit to Governance

The evolution of Yogiraj Powertech Limited (YPL) is defined by de-risking national infrastructure through three decades of operational discipline. This 35-year journey from a specialized proprietorship to a diversified EPC powerhouse serves as the foundation for the company’s current institutional stability.

The company’s narrative began in 1989, when Mr. Ravindra Ganesh Nene established a proprietorship to address specialized pumping machinery needs. The pivotal strategic shift occurred on March 29, 2010, with the formal incorporation of YPL.

Transformation Highlights
FeatureProprietorship (1989–2009)Corporate Era (2010–Present)
Market PositioningSpecialized pump maintenance & O&MDiversified EPC leader: Power, Water, Urban
Governance StructureSingle-entrepreneur leadershipMulti-tier Board & ISO 9001:2015
Technical ComplexityMechanical & State-level projects220KV Substations & Nuclear Zones
Capital StructurePersonal credit & Limited capitalStrong banking & Institutional-grade readying
150+
Full-time Professionals

Our human capital base bridges the gap between historical field mastery and future-ready engineering.

Our DNA

Our Values

Precision

We adhere to the strictest standards of engineering accuracy.

Collaboration

We work hand-in-hand with agencies to deliver seamless results.

Reliability

Our infrastructure stands the test of time and elements.

Our Vision

To be the premier partner for India's infrastructure development, setting benchmarks in quality, safety, and sustainable engineering solutions.

Our Mission

To execute complex electrical and mechanical turnkey projects with precision, fostering long-term relationships through reliability and excellence.

Our Purpose

To power the nation's growth by building robust infrastructure that improves lives, drives economic progress, and creates a sustainable future.

Section 03

Governance & Oversight

As YPL advances toward public market readiness, its Board of Directors has been structured to provide the transparency and ethical oversight required by institutional stakeholders.

ISO 9001:2015 Compliant
Institutional Ready

The Governance Model

The presence of Independent Directors is a cornerstone of YPL’s status. Their oversight strengthens the company's internal controls and audit mechanisms, ensuring adherence to the highest standards of corporate integrity.

Section 04

Record of Stability

Verified fiscal discipline and adaptation to escalating project complexities.

Turnover Progression (INR)

1996₹1 Crore
2008₹10 Crore
2013₹25 Crore
2017₹50 Crore
2022₹75 Crore
FY 25-26₹100 Crore
Voltage Upgrades

11KV (1990) → 220KV Substation (2022)

Mechanical Scaling

50 HP (1989) → 600 HP Projects (2024)

Transformer Cap.

10 MVA in 2009 → 65 MVA by 2022

MJP Emergency

Completed critical work in record 25-days.

Looking Ahead

Powering National Missions

National Missions (Jal Jeevan, AMRUT 2.0)
Strategic Megaprojects (Vadhavan Port, NAINA)
Sustainable Infrastructure (Solar BoS, EV)